05/06/17 - Senior design night

 

 

05/03/17 - Third driving test was performed.

 

04/29/17 - Second driving test was performed.

 

04/28/17 - First driving test was performed.

 

file2-4

04/26/17 - New design for braking system was constructed.

 

04/28/17 - Fourth oral presentation was performed.

 

IMG_3331

04/21/17 - CEAC Project Review

 

6

04/20/17 - New design for steering system was constructed. 

 

Jpeg

04/10-13/17 - Parts were ordered for braking and steering system.

 

1

March , 2017 - Utilized documentation software, Vault, for CAD construction. Testing methods for braking system was sketched while ordering materials were searched.

 

IMG_3335

February, 2017 - Team began the CAD drawing for steering system and undertook calculations for braking system.

 

IMG_3234

12/12/16 - Final draft of PPFS was submitted and uploaded online. 

 

12/07/16 - Second oral presentation was performed.

 

11/22/16 - Team 5 had the fourth meeting with Prof. Van Antwerp.

 

11/14/16 - Team 5 created the rough draft of its Project Proposal and Feasibility Study (PPFS).

 

11/08/16 - Team 5 had the third meeting with Prof. Van Antwerp.

 

2

11/04/16 - Team 5 created the project poster

 

10/21/16 - First oral presentation was performed.

 

10/18/16 - Team 5 had its second meeting with Prof. Van Antwerp.

 

file1-6

10/04/16 - Team 5 had its first meeting with senior design adviser, Prof. Van Antwerp.

 

9/28/16 - The team met with Phil Jasperse, Professor Van Antwerp, and Professor Nielsen to hear about the project background and further advice for a direction.

 

9/19/16 - Initial specification of the design was sketched.

 

9/14/16 - The Calvin Bolt 3.0 project was approved.

 

1

9/9/16 - Team 5 was formed as a group of four mechanical engineers.